Client: | Public Works Authority Construction Company |
---|---|
Year completed: | 20170517 |
Project leader: | Ashghal |
Price: | OR.1,084,607,299.34 |
The Works addressed by the Project comprises the design, execution, completion, and remediation of defects of the Lateral Interceptor Sewer network in Central Doha which connects to the Main Trunk Sewers at seven locations.
The Works include the design, procurement, construction, testing, completion and defects correction of the following:
Work Schedule details comprise the design, construction, testing, commissioning and handing over of the following works:
1. LIS-01 sewer upstream of MTS-01 work shaft WS11
2. LIS-01 sewer upstream of MTS-01 access shaft AS13
3. LIS-01 sewer upstream of MTS-01 work shaft WS1
4. LIS-01 sewer upstream of MTS-01 access shaft AS01
5. LIS-01 sewer upstream of MTS-01 access shaft AS02
6. LIS-01 sewer upstream of MTS-01 work shaft WS4
7. LIS-01 sewer upstream of MTS-01 work shaft AS03
Site location is in the Central Doha (within Doha South). There are seven MTS-01 shafts where one, or more, LIS-01 sewers will connect to the three branches (Western, Northern and Eastern) of the MTS-01 Located within Doha South.
The Site is a highly developed urban area with relatively flat topography ranging from +3.9m to +15.3m above the Qatar National Height Datum. The alignments typically follow existing roadways and will cross a number of existing and proposed utilities.