Microtunnelling at CTC Army Camp

information

Client: Public Works AuthorityConstruction Company
Year completed: 20170703
Project leader: Ashghal
Price: OR.2,179,620.00

Microtunnelling at CTC Army Camp

The work comprises of the Construction of Central Training Camp, Al Sailiyah Area Sewer Connections together with the Construction of the necessary sewer network pipe line to connect into the existing network all as described herein.

The facilitating construction works include:

Lying of approximately 342 m of 300 mm diameter sewers using Non-Disruptive method.
Construction of a new Very Deep Manholes – 4 No.’s of 1.5m internal diameter.
Reinstatement of Existing Services.
Includes testing, commissioning and maintenance of whole works.