Roads and Infrastructure in Doha Industrial Area

information

Client: Public Works AuthorityConstruction Company
Year completed: 20170719
Project leader: Ashghal
Price: OR.1,360,486,051.34

Roads and Infrastructure in Doha Industrial Area

Out of the 7-Package Road and Infrastructure Doha Industrial Area Project, the area of Package 1 is approximately 480 hectares. The objective of the project is essentially to rehabilitate and upgrade the roads and infrastructure in the Doha Industrial Area in line with future plans, while respecting existing development as much as possible. This would make the Doha Industrial Area safer, healthier, and less congested, improving the overall quality of life for its inhabitants, workers and visitors.The works include, but are not limited to the following:

38 km of roadwork, including removal of existing pavement, excavation and embankment, and pavement construction.
Site clearance, removing abandoned vehicles and other heavy and light discarded material including disposal of any contaminated material with the roads right-of-way.
Traffic management during construction and access to existing developments.
HV/MV/LV diversion and protection.
Water supply diversion and protection.
TSE diversion and protection.
Telecom diversion and protection.
Signing and road marking.
Construction of a new combined storm water/groundwater drainage network.
Construction of drainage lift stations, including builder’s work and electro-mechanical installation.
Excavation and construction of drainage ponds.
Drilling and construction of deep injection boreholes.
Construction of street lighting and traffic signals.
Provision of civil works for Intelligent Transport System.
Provision of civil works and installation of DSSS security systems.
Landscaping, including planting, hardscape and street furniture.
Construction of landscape irrigation network.
Construction of precast concrete boundary walls along the periphery of selected land parcels.
Demolishing of deteriorated existing boundary walls as instructed by the Engineer.
Construction of approximately 2700m of 2400mm RCC pipeline with PVC or GRP lining by Micro Tunneling with all required civil works including boring, jacking, supply of pipes, including design and construction of temporary and permanent access shafts with false walls where required, access chambers etc.